Kimco Realty
Low-Voltage
The Scope for WB Moore’s Low Voltage Team included the installation and connection of all Fire Alarm wiring and devices, including NAC Devices (Strobes, horn / strobe combos); Smoke Alarm Devices (Pull station, Smoke detector, Duct Detectors and test switches, tamper / flow relays); Installed and wired Siemens FC2005 Fire Alarm Control Panel, PAD (NAC power supply) and annunciator.
Our trained technicians also assisted Siemens with troubleshooting and full commissioning and tied the system into existing building equipment.
Additional scope for the Kimco office included Tele/Data installation. We provided all labor and materials to install approximately (122) Cat6 cables to various locations, and install Cat6 terminating hardware (Jacks, faceplates, and patch panels). Wiring devices and supports were installed in the ceiling with industry approved hardware.
All wiring is tested and submitted to CommScope for their 25yr material solution warranty.
![Kimco_1. First Photo, Thumbnail and gallery – Back of rack wiring Kimco Back of Rack Wiring](https://www.wbmoore.com/wp-content/uploads/2023/07/Kimco_1.-First-Photo-Thumbnail-and-gallery-Back-of-rack-wiring.jpg)
![Kimco_1. Second Photo and gallery – top rack wiring Kimco Top of Rack Wiring](https://www.wbmoore.com/wp-content/uploads/2023/07/Kimco_1.-Second-Photo-and-gallery-top-rack-wiring.jpg)
Project Details
WBM Job Number: | 2022-074 |
Year of Completion: | 2023 |
Industry Sector: | Low-Voltage |
Project Location: | Charlotte, NC |
Owner
![Logo_Kimco Kimco llogo](https://www.wbmoore.com/wp-content/uploads/2023/07/Logo_Kimco.png)
Client/GC
![Kimco_Logo_Doerre Doerre Lgoo](https://www.wbmoore.com/wp-content/uploads/2023/07/Kimco_Logo_Doerre.png)
Architect
![Kimco_Logo_MCG MCG Architects logo](https://www.wbmoore.com/wp-content/uploads/2023/07/Kimco_Logo_MCG.png)
Engineer
![Not Available Not Available Logo](https://www.wbmoore.com/wp-content/uploads/2023/07/Not-Available-e1689172089964-300x153.png)