Food Court Bowling Alley Screens Frankie's Exterior Scissor Lift Equipment Install
Project Location

Huntersville, North Carolina

Project Team
Godley Group of Charlotte, LLC
Owner

Godley Group of Charlotte, LLC

Balfour Beatty Construction
Contractor

Balfour Beatty Construction

ADW Architects
Architect

ADW Architects

Frankie's Fun Park

WB Moore proudly participated in construction of Frankies Fun Park a Disney like facility located in Huntersville, NC. From day one on this project the WB Moore team installed lighting fixtures that challenged us from the interior and exterior. Thanks to the General Contractor, Balfour Beatty, our suppliers and vendors we were able to work through these challenges and successfully complete this project and come out on the end having more knowlede and understanding of what it takes to complete a state-of-the-art amusement park.

WB Moore proudly participated in the construction of Frankies Fun Park a Disney like facility located in Huntersville, NC. 
From day one on this project, the WB Moore team installed lighting fixtures that challenged us from the interior and exterior. Thanks to the General Contractor, Balfour Beatty, our suppliers and vendors we were able to work through these challenges and successfully complete this project and come out on the end having more knowlede and understanding of what it takes to complete a state-of-the-art amusement park. 
 
The Convenience Power systems we installed included  ½” EMT minimum pipe size with setscrew fittings and copper wire and MC cable, where allowed by code for all branch circuits. The circuits our team installed supply power for all floor boxes in the arcade, general use receptacles, cooking equipment and the unique Brunswick bowling lanes.
We purchased and installed over 20 distribution boards ranging from 800 amps down to 150 amps. Along with several 480V to 120/208V transformers. Our estimating team based all  feeders on using PVC or EMT with aluminum conductors. 
 
The incoming service is based on 2500 amp, 480/277V, 3-phase main service, from a Duke Power utility transformer using #500 MCM aluminum conductors.
The Fire Alarm System was installed by Siemens fire alarm systems and included a fully functioning fire alarm system to meet the requirements of the local firecodes. This installation includeded a complete raceway system for the fire alarm wiring utilizing ¾” EMT conduit. Siemens scope included required programming, start-up, testing and training of Frankie’s employees for the fire alarm system.
 
Telecom System consists of  3/4” EMT Stubs to the ceiling space and single gang back box only. Cabling was completed by others. 
In addition to the Telecome System we installed 3/4” EMT Stubs to the ceiling space and single gang back box only for the Data System. 
All site sound, data and security conduit is conduit only with pull strings and is Stub ups only, any boxes or cabinets were to be installed by others. 
Access Control was installeed for the Tea-Cup, Midi-Swing, Midi-Discovery and Disk’o Rides. 
 
WB Moore installed all temporary lighting  and power throughout the entire 20 acre site per OSHA regulations.